PLP Wakefield

1.05 MILLION SQ FT SPECULATIVE DEVELOPMENT

PLAY VIDEO

1.05 MILLION SQ FT SPECULATIVE DEVELOPMENT

THE OPPORTUNITY

BREEAM ‘Very Good’ rating

EPC ‘A’ rating

Each unit fitted with a dual 25 kW DC rapid charger

Multiple electric charging points for vehicles and the infrastructure for occupiers to augment post

VRV heating and cooling system to offices

Minimum of 10% of the building’s energy from on site low and zero carbon technology sources

All car / HGV parking bays futureproofed to enable rapid charging stations

360 TOUR

Location

SILKWOOD PARK, WF5 9TP

PLP Wakefield at Silkwood Park is situated in a prime location which is adjacent to J40 of the M1 motorway, in an established commercial location with a strong occupational base and good access to a large, skilled labour force.

Drivetimes

DriveTimes

Origin Miles Time
M1 J40 0.6 miles 3 mins
Leeds 9.8 miles 15 mins
Sheffield 25 miles 32 mins
Manchester 37 miles 58 mins
Newcastle 65 miles 1 hr 38 mins
Origin Miles Time
Leeds Bradford Airport 17 miles 40 mins
Doncaster Sheffield Airport 27 miles 44 mins
East Midlands Airport 73 miles 1 hr 9 mins
Origin Miles Time
Wakefield Westgate 2.2 miles 8 mins
Wakefield Kirkgate 2.9 miles 13 mins
Origin Miles Time
Hull 61 miles 1 hr 4 mins
Immingham 70 miles 1 hr 9 mins
Port of Liverpool 82 miles 1 hr 25 mins

Siteplan

Sustainablity

PLP MK will be built to the PLP environmental standard, incorporating a range of eco-conscious features that will both benefit our planet and enhance the lives of those visiting and working at the site

  • £1.2 MILLION

    Bio-diversity offsetting contribution – habitats in accordance with the
    Milton Keynes Biodiversity
    Offsetting Scheme

  • SOLAR

    Green future proofing to
    allow occupiers to install
    up to 100% PV roof coverage

  • 17 ACRES

    The creation of 17 acres of lowland meadows and investment in public
    open spaces across the town

  • £250,000

    Investment in public art

  • BUS STOP

    On-site bus stop
    plus investment in improvements
    to local bus routes

  • £1.66 MILLION

    Carbon offset contribution
    in line with the council’s sustainable Contribution Supplementary Planning Document (2007)

  • 9.4 ACRES

    Archaeological
    protection

  • 3.8 KM

    Pedestrian and cycle access, integrated into
    the Milton Keynes Red
    Way cycle network via
    the estate spine road

  • CYCLE PATHS

    Extensive on-plot
    provision for cycle
    storage, maintenance
    and showering facilities

  • EV CHARGING

    3.8 KM Electric vehicle charging points throughout the scheme

  • ECOLOGY

    Ecological protection
    and mitigation for
    reptiles, bats, badgers,
    nesting birds and
    the watercourse

  • COMMUNITY

    Supporting the community with financial investment in social and emergency services